Bow section inverted.


The blocks are transported from the factory to the slipway.


Equipped with a stern deck.


From the bottom, you can see the welds that connect the blocks together. (All welds are inspected.)

Sanitary compartment and laboratory blocks are mounted.


The block of the bow section is mounted.

All steel blocks are now mounted.