The setup of the mud collector before
placing it in the water requires a two-step operation: retracting the spring
and setting it on the trigger, and then opening the bucket and setting it on
the trigger. The procedure is described in detail below.
In the beginning, the bucket is lifted and
the spring is retracted and set on the trigger as shown in Fig. 10. Since the
bucket is subjected to strong spring repulsive force in this process, use the
special tool shown in Fig. 11 for this operation. First, insert the connecting
plate into the hole in the center of the upper surface of the support frame
(Fig. 10-a). Next, insert the tip of the metal lever through the upper hole in
the connecting plate and the support pin through the lower hole (Fig. 10-b). By
inserting the support pin, the connecting plate and the bucket support frame
are connected, so when the handle of the lever is pushed down and the
connecting plate is pulled up, the bucket support frame is also pulled up at
the same time. Finally, close the trigger hook and secure the bucket support
frame (Fig. 10-c). The trigger hook can be opened and closed by moving the
bottom plate arm as shown in Fig. 4. The sequence of operations is shown in a
series of photographs in Fig. 12.